Project Summary

Dublin Methodist Church

  • Hot water system
  • DX cooling
  • Forced air constant volume

 

 

 

 

 

 

Project - Dublin Methodist Church

Dublin, Virginia


Process piping used for the hot water system

 

In 2004 the church had a fire in their educational wing. They started rebuilding and also took the opportunity to expand. Originally, they had a hot water system with no air conditioning. They are going back with a hot water system with DX cooling, forced air constant volume. We have maintained their system for several years and when tragedy struck, we were able to help them out. That's what a good relationship is all about!